Donatus Pharmacy: Personnel Scheduling with Employee Preferences |
作者姓名:Christoph Haehling von Lanzenauer; Olaf Pohl; |
商品類型:Case (Field) | 商品編號:9B18D022 |
出版日期:2018/11/30 | 內容長度:11 頁 |
In March 2017, a pharmacy in Berlin encountered a personnel scheduling problem. The pharmacy’s key activity was serving customers in-store with ready-made medication. These services had to be offered during regular opening hours, on occasional Sundays, and during pre-assigned emergency-service shifts. In addition, customer-specific formulations had to be prepared, and certain office duties had to be performed. A particular aspect of the problem was .....more
|
Donatus Pharmacy: Personnel Scheduling with Employee Preferences - Instructor Spreadsheet |
作者姓名:Christoph Haehling von Lanzenauer; Olaf Pohl; |
商品類型: | 商品編號:5B18D022 |
出版日期:2018/11/30 | 內容長度:1488 頁 |
Instructor spreadsheet to accompany product 8B18D022.
|
Donatus Pharmacy: Personnel Scheduling with Employee Preferences - Student Spreadsheet |
作者姓名:Christoph Haehling von Lanzenauer; Olaf Pohl; |
商品類型: | 商品編號:7B18D022 |
出版日期:2018/11/30 | 內容長度:285 頁 |
Student spreadsheet to accompany product 9B18D022.
|
Donatus Pharmacy: Personnel Scheduling with Employee Preferences - Teaching Note |
作者姓名:Christoph Haehling von Lanzenauer; Olaf Pohl; |
商品類型: | 商品編號:8B18D022 |
出版日期:2018/11/30 | 內容長度:21 頁 |
Teaching note for product 9B18D022.
|
Red Brand Canners and Its Supply Chain |
作者姓名:Christoph Haehling von Lanzenauer; Olaf Pohl; |
商品類型:Case (Library) | 商品編號:9B12E007 |
出版日期:2012/08/10 | 內容長度:5 頁 |
Developed as a companion to the Red Brand Canners (RBC) case, the starting point in this case is the improvement in performance resulting from the optimization approach in the original case. However, RBC’s vice president of operations is concerned about the quality and quantity mix of the most recent tomato crop received from Greenfield Farms (GF). RBC’s preferred quality and quantity mixes differ significantly from the current harvest. To RBC, the .....more
|